OUR INSTALLATIONS

FIND HERE ALL OUR INSTALLATIONS SINCE 2013

INSTALLATION
IN PARIS

The Butte-aux-Cailles swimming pool in Paris is the first swimming pool to be equipped with a digital boiler, in collaboration with Paris City Hall.

  • IMPLEMENTATION DATE: May 2017
  • TYPE OF BUILDING: swimming pool, indoor and outdoor

INSTALLATION
IN NANTES

Cette installation a été mise en place en collaboration avec le bailleur social Nantes Métropole Habitat.

  • IMPLEMENTATION DATE: July 2016
  • TYPE OF BUILDING: Social housing, 40 apartments

INSTALLATION
IN GRENOBLE

It is the second digital boiler installed in Grenoble, in partnership with Nexity.

  • IMPLEMENTATION DATE: February 2016
  • TYPE OF BUILDING: Student Residence, 110 Studios apartments

INSTALLATION
IN LYON

The collaboration with Lyon 3 university allowed the installation of a digital boiler.

  • IMPLEMENTATION DATE: September 2014
  • TYPE OF BUILDING: University

INSTALLATION
IN GRENOBLE

First implementation of Stimergy's digital boiler, in its home city, Grenoble. In collaboration with OPAC38, a French landlord.

  • IMPLEMENTATION DATE: July 2013
  • TYPE OF BUILDING: social housing, 29 apartments